2004 | 2005 | 2006 | 2007 | 2008
Group Annals 2008

Jan. 19-20, 2008 BEIH convenes its 2008 Conference, where achievements of BEIH over the last three years since its incorporation are summarized, and it is determined that BEIH shall conduct its work throughout the year of 2008 focusing on the following four priorities, i.e., resource development, asset integration, integration of industries and financing and managerial innovation.
Jan. 19, 2008 UK Prime Minister H.E. James Gordon Brown and his entourage visit the construction site of the CCHP Project at Taiyanggong Township in Beijing by BEIH.
Mar. 8, 2008 The Media Briefing Session on Daihai Model of BEIH is held at Daihai Hotel in Liangcheng County in Inner Mongolia Autonomous Region, and leading media thereafter intensively report on Daihai Model, which significantly promote BEIH¡¯s social popularity and influence.
Apr. 9, 2008 Co-invested by BEIH and the Hanjiang River Group, Hubei Jingneng Longbeiwan Hydropower Development Co., Ltd. is officially incorporated in Zhushan County in Hubei Province, which is the first large-sized hydropower plant to be built by BEIH in central and southern China.
May 20, 2008 Since the occurrence of the earthquake in Wenchuan County in Sichuan Province, all units and staff of BEIH have been proactively donating to the quake-hit areas. As of June 2, 2008, donations from BEIH total RMB 4.4623 million Yuan.
Morning of May 23, 2008 Beijing Tianchuang Real Estate Co., Ltd., of which BEIH is the controlling shareholder, changes its name into BEIH Property Co., Ltd., which signifies that BEIH has basically completed integration of its real estate businesses, and BEIH Property Co., Ltd, listed in Shanghai Exchanges, will be the platform for future development.
May 23, 2008 A signing ceremony for strategic cooperation agreement between BEIH and Industrial and Commercial Bank of China Limited is held at CBD International Building in Beijing, under which ICBC Beijing Branch offers BEIH a guarantee-free credit line in the amount of RMB 10 billion Yuan.
May 31, 2008 No. 4 generator unit of the expansion project of the second phase of Zhangshan Power Plant (2x600 MW), of which BEIH is the controlling shareholder, is passed a test run of 168 consecutive hours for the first trial, making the total installed capacity in operation as approved of the said plant at 1.80 million kW, and it therefore becomes the largest power generation enterprise across Shanxi Province that is under provincial dispatch.
Jun. 10, 2008 The National Development and Reform Commission approves the pithead power plant project with comprehensive utilization of coal gangue located at Suancigou at Jungar Coalmine in Inner Mongolia Autonomous Region. With an installed capacity of 2x300 MW, the project is scheduled to be kicked off on July 9, 2008.
Jun. 16, 2008 The National Development and Reform Commission approves the 300 MW wind-farm franchise project located at Ulan Yiligeng in Bayan Nur City in Inner Mongolia Autonomous Region, with the franchise term of 25 years. By then, the installed capacity in operation of wind-farm power projects of BEIH is at 148.5 MW, and its approved installed capacity of wind-farm power projects in progress is at 643.5 MW.
Jun. 28, 2008 In the selection of 2007-08 Benchmark Information-based Power Enterprises conducted by China Electricity Council, Shanxi Zhangshan Power Generation Co., Ltd., Inner Mongolia Daihai Electric Power Generation Co., Ltd. and the Jingyang Company, of which BEIH is the controlling shareholder, win the honorary title of ¡°Benchmark Information-based Power Enterprises¡±.
Aug. 8, 2008 All Olympic Games-related projects by BEIH are ready for actual operations during the 2008 Beijing Olympic Games. As Beijing Jingneng Thermal Power Co., Ltd, Taiyanggong Gas-fired Power Plant, Jingfeng Gas-fired Power Plant, Inner Mongolia Daihai Electric Power Generation Co., Ltd., Guanting Wind-farm Project and the geothermal heat pump project are all for providing safe, stable and green energies to the 2008 Beijing Olympic Games, they are therefore highlights of the Beijing Olympic Games-related projects.
Aug. 15, 2008 BEIH initiates a writing contest in celebration of the 30th Anniversary of the Reform and Opening-up Policy, staff with branches and subsidiaries of BEIH are enthusiastic in submitting their writings to eulogize huge achievements made during the last three decades, and to express their profound affections to BEIH. In December 2008, BEIH rates and selects nine papers as first prize winners, 21 papers as second prize winners and 24 papers as third prize winners.
Aug. 30, 2008 The appraisal results of 2008 Top 500 Chinese Enterprises by China Enterprise Confederation are released, according to which, BEIH ranks the 500th place in 2008 Top 500 Chinese Enterprises based on its operating income in the amount of RMB 9.31 billion Yuan, ranks the 138th place in 2008 Top 500 Chinese Enterprises in Service Industry; and ranks the 135th place in 2008 Top 200 Best-performed Chinese Enterprises based on its net profit in the amount of RMB 1.771 billion Yuan.
Sep. 9, 2008 A delegation from the Ministry for Transport, Innovation and Technology of the Republic of Austria visits BEIH, and the two sides discuss on issues in relation to joint construction of the China-Austria Science Park. As a matter of fact, BEIH is a leading participant from the Chinese side in the bilateral cooperation projects.
Sep. 2008 In the National Power Generator Unit Competition conducted by China Electricity Council, five generator units of BEIH branches and subsidiaries win prizes for different categories: Generator Units No. 4 and No. 1 by Beijing Jingneng Thermal Power Co., Ltd. are a special prize winner and a second prize winner among generator units with an installed capacity of 200 MW; Generator Units No. 1 and No. 2 by Inner Mongolia Daihai Electric Power Generation Co., Ltd. are third prize winners among generator units with an installed capacity of 600 MW; while a generator unit by Shanxi Zhangshan Power Generation Co., Ltd. is a third prize winner among generator units made in China.
Sep. 26, 2008 At a commending conference on Innovation Achievements and Corporate Culture Excellent Achievement by Chinese Power Enterprises held by China Electricity Council, two achievements by the Jingyang Company are awarded a second prize winner in Innovation Achievements and a special prize winner in Corporate Culture Excellent Achievements. Before that, in the selection of Innovation Achievements in Corporate Management Modernization in Beijing, a managerial innovation achievement by the Jingyang Company won a first prize, and another two managerial innovation achievements by Inner Mongolia Daihai Electric Power Generation Co., Ltd. won a first prize and a second prize.
Oct. 10, 2008 The unveiling ceremony for Yinchuan International Trade Center is held at the People¡¯s Hall of Ningxia, the project is developed and built by BEIH Property Co., Ltd., listed in Shanghai Exchanges. With its total floor space at 150,000 square meters, Yinchuan International Trade Center is the first large building complex in Yinchuan City comprising a five-star hotel, a public administration center, an office building as well as retail premises, and the project signifies that BEIH has made a breakthrough in implementing its strategy of ¡°going out¡±.
Oct. 20, 2008 BEIH convenes solemnly its Summarizing and Commending Conference on 2008 Beijing Olympic Games and Paralympic Games, where Mr. SHANG Heshun and Mr.LIU Chunxiao are commended by the CPC Central Committee and the State Council.
Nov. 7-9, 2008 At the 3rd Annual Meeting on Corporate Culture of Chinese Power Enterprises hosted by China Electricity Council Corporate Culture Development Center, China Enterprise Competency Promotion Council and other institutions, Inner Mongolia Daihai Electric Power Generation Co., Ltd. is awarded the honorary title of ¡°2008 Demonstration Base of Corporate Culture Soft Power for Chinese Power Enterprises¡±.
Nov. 30, 2008 The No. 2 generator unit of the coal gangue-fueled power plant by Jingneng (Chifeng) Energy Development Co., Ltd. is smoothly connected to a power grid; on June 15, 2008, the No. 1 generator unit of a bio-based power plant with an installed capacity of 2x12 MW by Shandong Jingneng Biomass Power Generation Co., Ltd. was smoothly connected to a power grid; and the above two events signify that BEIH has taken substantial steps towards bio-energy and comprehensive utilization of resources.
Dec. 11, 2008 The National Development and Reform Commission approves the 2x600 MW supercritical coal-fired power units project at Shuidonggou in Ningxia Hui Autonomous Region, which signifies that BEIH has made a substantial breakthrough in developing power source projects in the said Autonomous Region.
Dec. 22, 2008 BEIH convenes a Leading Cadres¡¯ Conference attended by Mr. JI Lin, Executive Vice May of Beijing and other leaders. It is announced that, Mr. LU Haijun is appointed as the Board Chairman of BEIH upon a decision by the Government of Beijing Municipality; Mr. GUO Mingxing is appointed as Director of BEIH upon a decision by the State-owned Assets Supervision and Administration of the Government of Beijing Municipality. On December 26, 2008, the Board of Directors of BEIH adopts a resolution that Mr. GUO Mingxing is engaged as BEIH¡¯s General Manager.
© powerbeijing.com